| Please read the General information section before installation. |
|
|
|
Inspection: Prior to installation, inspect planks in daylight
for visible faults/damage • check if subfloor/site conditions comply
with the specifications described in these instructions • if you are
not satisfied do not install, and contact your supplier.
Tools and materials required: Electric saw • spacers • pencil • set square • PE film • adhesive tape.
Moisture Protection: Lay
the PE film, allowing for at least 20 cm (8”) overlapping and tape •
turn the film upward 5 cm (2”) along the walls • trim after the
skirting boards are fixed.
Before laying: Measure the
room at right angle to the direction of the planks • planks in the
final row should be at least 5 cm wide • for this purpose, planks in
the first row can be cut to smaller size • shuffle planks in order to
obtain a pleasant blend of shades • lay planks preferably following the
direction of the main source of light • we recommend laying on wooden
floors crossways to the existing floorboard • planks must not be nailed
or screwed to the subfloor • skirting boards must not be fixed in a way
which restricts the movement of the floor.
Expansion gaps: provide 10 mm (3/8”) expansion gaps to the walls and other fixed
objects • areas greater than 100 m² (900 sq. ft) or 10 m (30 feet) in
either direction, transitions between rooms and asymmetrical areas
require extra expansion gaps. |
|
|
|
| Start laying: |
|
|
| 1. Start in the corner • turn the tongue side of the plank to the wall • maintain a gap of 10 mm (3/8”) on the short side. |
|
 |
|
|
|
| 2. Hold the next plank at an angle against the first one and lay it flat on the floor • complete first row in the same way. Cut final plank of the first row to correct length • start next row with the piece leftover (must be at least 300 mm (12’’) long) • ensure that end joints are staggered at least 300 mm. |
|
 |
|
|
|
| 3. Place first plank of the new row with the tongue side at an angle against the groove side of the plank in the previous row • press forward and lay it flat at the same time. |
|
 |
|
|
|
| 4. Place short end of the plank at an angle against the previous installed plank and fold down • ensure that the plank is positioned on the integral locking strip of the plank in the previous row. |
|
 |
|
|
|
| 5. Lift planks (together with the previous laid in the same row) lightly up (about 30 mm (9/8’’)), push it against the row in front and then put it down. Adjust the distance to the wall to 10mm (3/8’’) when three rows are completed • proceed installation as described above until reaching the opposite wall. |
|
 |